Tuesday, May 15, 2007

Foundation Work

There is a lot of activity at the work site today -- 6 men are busy about the foundation for the gazebo.
The footers are being dug down to rock between the posts and even deeper through rock where the bases of the posts will rest.
The digging involves one man using the pick to loosen the dirt and rock.

Then a second man uses the shovel to remove the loosened material. That loose material gets piled into the center of what will be the gazebo floor to start building up for the pad which will be poured once the foundation is done.

No comments: